Gate Actuators

Sliding Gate Actuators mounted in parallel with the foundation. Drive power should be calculated on the gates weighing up to 600 kg, if they are installed on a suburban site, or at the gates weighing up to 2500 kg, if the industrial enterprise. Sometimes the blade mounted on rails. Another important point – the adjustment of roller bearings. Front edge of the first roller bearings must not be closer than 150 mm from the edge of the opening. A second roller bearing allows closed the gate to fall in detecting channel. Installation of sectional doors An important feature of the installation of sectional doors are the requirements for material used in walls.

Installation is possible only If an opening is made of tough, durable material. Otherwise be required to implement pre-amplification of the perimeter of the opening with brick or steel profiles. Another requirement, which should not be forgotten – it is availability of free space on the sides of the wall (not less than 120 mm) and the top opening (not less than 150 mm). The process of assembling a sectional door is made in several stages. The first preparatory stage. Before installation to check the size of a doorway – they must conform to the dimensions in the technical characteristics of the gate. After that, unpack the gate and identify their major parts. The second stage – the assembly on the floor.

Side rack attached to the mechanism of motor / drum / canvas. At the next stage involves setting the operating position. Gate with available improvised up and combine with the opening. During these specifications of the gate. After that exhibited by the level of the drum, which is adjacent to the doorway upper profile and the side bar. It is very important to ensure the best possible sealing seal the gap between the frame gates and the wall to which they are mounted. When the gates are installed, by filling the bands holding the canvas side guides. During the preparation of the electrical connections first, strengthen the control unit (A place for him in agreement with the customer), then test fit the power supply voltage plug transformer, motor and frequency inverter. And only after that in accordance with the electrical circuit carry the connection. The final step – adjustment and tweaking. One of the most difficult moments of the installation of sectional doors is the ability to accurately set the level of the canvas and the guides, avoiding any distortions. Minimal distortion in the near future could lead to breakage. Installation of swing vorotPri mounted swing gate increased requirements for filling the gap. It is very important to properly install poles, which will be attached sheet. They should be strictly horizontal, thus to be buried in the ground and concreted not less than 180 cm gaps between doors gates between the mounting posts and doors, or hiding special profiles or render over. After this is installed automation. Both doors are equipped with the drives, then put solar cells, brackets, switches, and then by mounting block management. In conclusion, once again recall that the installation of automatic gates requires high professionalism of the performers. Accuracy is very important preparatory measurements, the slightest mistake they will be the reason that the term manual gate significantly reduced. Based on this, and yet a number of nuances that we do not recommend to install automatic gates themselves.